“A Proposed Model for Predicting Cost and Schedule Overruns Caused by Risks in Bridge Construction Projects” (2025) Latakia University (formerly Tishreen) Journal for Research and Scientific Studies - Engineering Sciences Series, 47(4), pp. 193–212. Available at: https://journal.latakia-univ.edu.sy/index.php/engsc/article/view/20340 (Accessed: 16 October 2026).