1.
Integration between Earned Value Method and risk analysis to monitor and track the risks of construction projects. Tuj-eng [Internet]. 2024 Aug. 12 [cited 2026 Aug. 14];46(3):321-40. Available from: https://journal.latakia-univ.edu.sy/index.php/engscnc/article/view/17281